• Conventional onsite storage systems are unequipped to handle proppant requirements in today’s industry, resulting in insufficient sand volume ready to feed the fracture operation. Shortages of hot sand on site lead to increased nonproductive time, increasing operational costs. The SandBank proppant silo system from NOV increases sand storage capacity, creating a smaller footprint, improving efficiency in unloading sand transports, and limiting dust exposure.

    Read the full article from the September E&P edition here.

    Published Date: 2018-10-11
    Source: National Oilwell Varco